MO14 - Turnkey Lift Stations: Sizing and Selecting Pumps, Basins and Controls

Event Time

Originally Aired - Monday, February 17 10:30 AM - 12:00 PM

Info Alert

Create or Log in to My Show Planner to see Videos and Resources.

Videos

Resources

Create or Log in to My Show Planner to see Videos and Resources.


{{chatHeaderContent}}

{{chatBodyContent}}

Resources

Create or Log in to My Show Planner to see Videos and Resources.


Info Alert

This Session Has Not Started Yet

Be sure to come back after the session starts to have access to session resources.

Event Location

Location: Rm235


Description

This presentation covers everything needed to size and select a complete, turnkey solution to wastewater and stormwater lift stations. This presentation will cover the three primary components: pumps, basins, and controls, and the factors to consider when sizing and selecting each. This presentation is valuable to engineers, contractors, installers, and anyone in the water/wastewater industry.

After this session, attendees will be able to:

1. Explain the following related to Pumps: Questions to ask/information needed; different forms of wastewater and the different pumps used for each; flow and how to determine it; total dynamic head: static, friction loss, operating head; pump selection.
2. Explain the following related to Basins: Information needed; critical dimensions: min. diameter, inlet depth, submergence, working volume; accessories and options.
3. Explain the following related to Controls: Information needed; level monitoring options; accessories and options.

Level: Intermediate


Event Information

Type: 90-Minute Education Session


Speakers


Tracks


Audience

  • Intermediate

Notes

Create or Log in to My Show Planner to add notes.